Tender for Gas Turbine Plant-up project for Bintulu Power Station (Package A) and Miri Power Station (Package B)
Tender Requirements
Demonstrated experience (or the experience of a member in its Group or JV or sub-contractor/service provider) in the successful delivery of the relevant project which include design, procurement, construction, testing, and commissioning and putting into commercial operation of: (a) The Tenderer shall have, at minimum, within the past ten (10) years successfully completed at least one (1) GT power plant project with unit size of more than 30 MW
About This Tender
Tender "Tender for Gas Turbine Plant-up project for Bintulu Power Station (Package A) and Miri Power Station (Package B)" has been published in Sarawak. This tender requires field code Demonstrated experience (or the experience of a member in its Group or JV or sub-contractor/service provider) in the successful delivery of the relevant project which include design, procurement, construction, testing, and commissioning and putting into commercial operation of: (a) The Tenderer shall have, at minimum, within the past ten (10) years successfully completed at least one (1) GT power plant project with unit size of more than 30 MW. Closing date: 17/07/2024. This building or infrastructure project is open to licensed contractors with relevant experience. Prospective bidders should examine the technical requirements and submit compliant proposals.