Closed

Tender for Tank Inspection, Cleaning, Repair, Tank Calibration and Painting for Three (3) Units Diesel Vertical Storage Tank (No. 2, No. 3, and No. 4) at Sungai Biawak Kuching Power Station

Tender NumberDoc5078950890
Closing Date23 April 2025
LocationSarawak
LicenseEligibility: 1. Relevant industry qualifications / registrations; 2. Past project experience; 3. UPKJ Head (II) Subhead 2 (b), 2 (c), Category D and above; 4. Authorised/Experienced in tank verification, tank inspection, tank repair works, tank calibration and tank painting works; 5. To provide API653 Inspector; 6. Able to liaise closely with SIRIM for witnessing and endorsement of tank calibration report; and 7. To provide report based on API653 standard. Tank Inspection, Cleaning, Repair, Tank Calibration and Painting for Three (3) Units Diesel Vertical Storage Tank (No. 2, No. 3, and No. 4) at Sungai Biawak Kuching Power Station

Tender Requirements

Eligibility: 1. Relevant industry qualifications / registrations; 2. Past project experience; 3. UPKJ Head (II) Subhead 2 (b), 2 (c), Category D and above; 4. Authorised/Experienced in tank verification, tank inspection, tank repair works, tank calibration and tank painting works; 5. To provide API653 Inspector; 6. Able to liaise closely with SIRIM for witnessing and endorsement of tank calibration report; and 7. To provide report based on API653 standard. Tank Inspection, Cleaning, Repair, Tank Calibration and Painting for Three (3) Units Diesel Vertical Storage Tank (No. 2, No. 3, and No. 4) at Sungai Biawak Kuching Power Station

About This Tender

Tender "Tender for Tank Inspection, Cleaning, Repair, Tank Calibration and Painting for Three (3) Units Diesel Vertical Storage Tank (No. 2, No. 3, and No. 4) at Sungai Biawak Kuching Power Station" has been published in Sarawak. This tender requires field code Eligibility: 1. Relevant industry qualifications / registrations; 2. Past project experience; 3. UPKJ Head (II) Subhead 2 (b), 2 (c), Category D and above; 4. Authorised/Experienced in tank verification, tank inspection, tank repair works, tank calibration and tank painting works; 5. To provide API653 Inspector; 6. Able to liaise closely with SIRIM for witnessing and endorsement of tank calibration report; and 7. To provide report based on API653 standard. Tank Inspection, Cleaning, Repair, Tank Calibration and Painting for Three (3) Units Diesel Vertical Storage Tank (No. 2, No. 3, and No. 4) at Sungai Biawak Kuching Power Station. Closing date: 23/04/2025. This building or infrastructure project is open to licensed contractors with relevant experience. Prospective bidders should examine the technical requirements and submit compliant proposals.

Access More Tenders

Access thousands of tenders and never miss an opportunity.